New Step by Step Map For Cast in Situ Piles
Concrete shall be provided for the pile by transit mixers and positioned by the total length tremie pipe approach.Piles ended up casted better than the ultimate stage to control laitance (impurities that have migrated to the highest in the piles) all through the construction on the piles.Plastic spacer or equivalent (75mm) shall be tied on the cage